Golden Quartz & Green Shrewsbury

This project required the repair of a severely damaged concrete drive, the front third had to be removed and fibre re-enforced concrete was used tie bars where attached to existing concrete to tie both old and new together. The drive was then framed in tumbled brick pavers prior to the resin surface being applied